Material, geometry and inspection requirements belong in the project specification. Our quality approach connects manufacturing records with the agreed acceptance criteria.

Certifications & Credentials

Our quality credentials

Click any certificate to view it in full size.

IATF 16949 Quality Management System Certificate — Page 1
IATF 16949 Quality Management System Certificate
ISO 9001 Quality Management System Certificate — Page 1
ISO 9001 Quality Management System CertificatePage 1 / 3
ISO 9001 Quality Management System Certificate — Page 2
ISO 9001 Quality Management System CertificatePage 2 / 3
ISO 9001 Quality Management System Certificate — Page 3
ISO 9001 Quality Management System CertificatePage 3 / 3
ISO 9001 Certificate (DQS) — Page 1
ISO 9001 Certificate (DQS)
HOW QUALITY IS CONTROLLED

Four commitments,
every project.

A defined scope for material, geometry, records and acceptance — agreed before production.

Discuss your project ↗
  1. 01

    Material first

    Grade, standard and verification are agreed before tooling begins.

  2. 02

    Geometry defined

    Datums, tolerances and surface finish come from your drawing.

  3. 03

    Traceability kept

    Production records and inspection feedback follow each batch.

  4. 04

    Acceptance agreed

    Inspection scope is set before manufacturing begins.

01

Material verification

Material verification

Material analysis and hardness checks appear in the company’s documented quality workflow. Required material certificates, sampling and test methods should be defined during technical review.

02

Internal integrity and cleanliness

Internal integrity and cleanliness

Compressor castings can require particular attention to internal defects, residual sand and sealing surfaces. Please specify cleanliness and leak-test requirements, including method, pressure and acceptance threshold where applicable.

03

Dimensional inspection

Dimensional inspection

Critical dimensions, datums, tolerances and surface finish should be identified in the approved drawing. The inspection plan and report format are agreed for the project.

04

Production records

Production records

The company profile describes production planning, production records, material analysis and inspection feedback. Discuss the traceability documentation your supplier approval process requires.

05

Supplier qualification

Supplier qualification

Request current certification documents and their applicable scope during supplier qualification. Certification status and covered entities should be checked using the current documents.

06

Clear acceptance criteria

Clear acceptance criteria

Inspection scope is agreed before production. Do not assume that leak testing, nondestructive testing or a particular report is included without confirmation in the quotation.

LET’S MAKE YOUR NEXT COMPONENT

It starts with
your drawing.

Share your requirements. Let’s define the right casting and machining scope for your project.

Upload your drawing ↗PDF · DWG · DXF · STEP · IGES · STL