SHANXI, CHINA CASTING & PRECISION MACHININGBuilt around your drawing ↗
ANXINFOUNDRY
EN中文DE
Custom iron casting drawing and engineering review for Japan buyers
JP · OEM SOURCING GUIDE

日本のお客様向け鋳鉄部品・機械加工の調達ガイド

Japanese sourcing teams often begin with exact drawing control, JIS designation, stable repeatability, traceable inspection records and careful change communication. Anxin reviews each requirement against the submitted drawing rather than assuming grade equivalence.

Anxin Foundry · Reviewed 29 October 2026
BUYER INTENT

What a Japan buyer is actually trying to de-risk.

Discovery starts with a part, material or problem. Supplier selection then moves through drawing control, evidence, sample approval and delivery scope. The page is structured in that same order so buyers and answer engines can verify each claim.

中国 鋳物メーカー FC250 機械加工FCD450 球状黒鉛鋳鉄 中国 調達コンプレッサー 鋳鉄部品 図面製作China foundry for Japanese industrial OEM drawings
LOCAL TERMINOLOGY & STANDARDS

Use the buyer’s language, then verify the specification.

ねずみ鋳鉄 / Grey iron

JIS G 5501 covers grey iron castings and uses FC terminology. State the JIS number, edition and grade required by the drawing.

球状黒鉛鋳鉄 / Spheroidal graphite iron

JIS G 5502 covers spheroidal graphite cast irons and uses FCD terminology. The standard and its applicable amendment should be identified.

図面改訂 / Drawing revision

Provide the controlled drawing number, revision, units, datums, critical dimensions and the authority for technical changes.

検査成績書 / Inspection report

Define the material, dimensional, hardness, microstructure or other reports required for samples and recurring lots. Scope is confirmed during review.

QUALIFICATION CHECK

Information that should exist before supplier approval.

  1. 01Exact JIS designation and edition
  2. 02Controlled 2D drawing plus 3D reference model
  3. 03Clear cosmetic and functional acceptance limits
  4. 04Sample approval before recurring production
  5. 05Lot traceability and inspection-record retention
  6. 06Change notification and bilingual technical clarification
ANXIN EVIDENCE PATH

Verify the factory before discussing the order.

01

Actual component photographs

Representative castings, as-cast stages and machined interfaces.

02

Manufacturing scope

Casting processes, machining resources and project boundaries.

03

Quality credentials

IATF 16949 and ISO 9001 certificates plus inspection context.

04

Legal entity and factory facts

Registered company identity, address, business scope and contact details.

RFQ INPUT

Send a package an engineer can review.

Include the information below with PDF, DWG, DXF, STEP, IGES or STL files. Anxin will respond with questions where the manufacturing or inspection boundary is unclear.

  1. 012D drawing, 3D model and controlled revision
  2. 02Material standard, grade, edition and test basis
  3. 03Annual volume, batch quantity and target delivery state
  4. 04Casting weight, critical wall sections and machining scope
  5. 05Special characteristics, inspection method and documents
  6. 06Destination, packaging, Incoterm and sample timing
Upload drawings for review ↗
BUYER QUESTIONS

Answers that define the boundary.

Does Anxin treat FC250 and HT250 as automatically equivalent?

No. The customer should provide the governing JIS specification and acceptance requirements. Anxin reviews chemistry, mechanical properties, test method, section thickness and drawing notes before confirming a material route.

Can Japanese drawings and inspection forms be reviewed?

Japanese labels can be retained alongside an English technical clarification. Critical notes, standards, dimensions and acceptance criteria should be confirmed in writing before quotation.

How should sample approval be defined?

State sample quantity, measurement points, material reports, appearance criteria, machining status and the approval authority. Recurring production should start only under the agreed approval route.

How are engineering changes handled?

Use a controlled drawing revision and identify affected characteristics. Tooling, process or inspection changes should be reviewed against the approved scope before implementation.

LET’S MAKE YOUR NEXT COMPONENT

It starts with
your drawing.

Share your requirements. Let’s define the right casting and machining scope for your project.

Upload your drawing ↗PDF · DWG · DXF · STEP · IGES · STL